after years and years
of complaining finally DBC
employed a firm
of Engineers Icax
who came to see
from November 18 to July 19
across several houses he
came to inspect
the installations
and was stunned officially.
he spent hours his examination
thorough and beyond
hour after hour of measuring
but without a magic wand
He found it had been cobbled together
terribly
butched buggered ruined
and at nights he came to see
most nights from 5 to 9
and some nights for tea
sprawled across the main bedroom
stuff just everywhere
he be so involved he actually
was moved and therefore stayed
from September 19 to February 20
plying his expert trade
All that while our leisure hours
our homework time spent cleaning up
night after night carl dud his stuff
we kept him going cup by cup.
energy meter fitted 13/12/2017 sunrealm
they did nothing with those figures
71.84 and when carl did some tests
he tweaked them down to £31.20
sunrealm hopeless.
Soffits replaced 23/10/2019/20
bathroom fixed June 2018